Imperial Power’s Time Saving Turnaround Cuts Outage Time by 12 Days

Imperial Power’s Time Saving Turnaround Cuts Outage Time by 12 Days

High Capacity Crawler Crane Transforms Switchyard Job Asubstation outage can be incredibly costly for an electric utility. To avoid an expensive shutdown at a high-voltage switchyard in southern Indiana, Imperial Power Services Inc., Newkirk Electric Associates,…

Imperial Crane on the front cover of ACT magazine along with Imperial Power featured in the same issue for the 756kV switchyard project.

Imperial Crane on the front cover of ACT magazine along with Imperial Power featured in the same issue for the 756kV switchyard project.

Crane choreography Imperial Power Services was called in to take care of business at an electrical plant. John Skelly reports. Last November T&D Power contracted Imperial Power Services of Bridgeview, IL to pick a 765kV…